This chapter is the lab census’s gap list (§8 of census C, 2026-11-23/24), carried into the book verbatim in substance. It is the honest to-do record: where the record is thin, what is unverified, and which contradictions stand unreconciled. A gap listed here is not softened anywhere else in the book — chapters cite these numbers.

  1. No per-machine inventory exists for any basement machine. Only the laptop amd has a collected record. CPU model, board-per-machine, RAM-per-machine, drive-per-machine: all ungathered (#1095 / #1096 / #1810 open). Every “identical core boxes” claim rests on Drew’s 2026-10-20 dictation.
  2. NIC specification unverified. “At least 200 Gb ports” (dictated) versus a 100GbE-max switch fabric of record; #1097 open. The LINSTOR/DRBD design cannot be sanity-checked until this lands.
  3. The three build-out Dell switches have no model, hostname, or state anywhere in the record (#6073–#6075 will create it). Whether they are the inventoried PowerConnect 5448s is unstated. Location/state (racked, in use, boxed) is unstated for every one of the 21 inventoried network devices — #13920’s first slice owns exactly this.
  4. DX010 count tension: the inventory says 4× owned (1 missing fans/PSU); #6071 says install 3 more. Install-of-owned versus buy-more is not distinguished in the record.
  5. Racking state unknown. No record of racks present, rails installed, or layout executed; #6070’s very subject (“another 4 each of racking”) is unresolved dictation.
  6. Power unverified beyond the brief: no installed-circuit record, no UPS record, no measured draw (600 W per machine is a planning assumption in the brief itself).
  7. Nothing cluster-shaped has run since the v1.9 test cluster was torn down. Cozystack, LINSTOR/DRBD, CNPG, RustFS, NATS, FluxCD on-cluster: zero deployments. TALM is proven only against local containers.
  8. #6078’s verdict not extracted. The SBC/Pi research issue (#6078) is closed, but its body checkboxes are unchecked and the census did not read its closing comments; the per-role verdicts (quorum witness / web serving / ID free tier) must be pulled from the issue before the book asserts them. This book asserts none.
  9. OCI contradiction — unreconciled, not resolved. Epic #1091 and child #4904 remain open on GitHub, while the memory of record (2026-10-31) says OCI is stood down and is not a backend. Both facts stand in this book, flagged as unreconciled. Neither this chapter nor any other picks a winner; reconciliation is programme work on #1091, not an editorial act.
  10. GPU framing tension: the register lists 3× Intel B50 + an RTX 2060 as owned-but-not-a-resource; #6072’s title records “local (none owned)” for the GPU-capacity question. The book uses the register’s list and notes the #6072 framing difference.
  11. ESP32 ownership is nowhere established. Hardware-doc is research, not ownership; no board is recorded as bought, flashed, or run. The AliExpress aggregation (#13910) is the planned fix and is blocked on Drew granting access.
  12. “Which ID app first” is still open (register open question #1, 2026-10-20; repeated in the P9 draft, 2026-11-12) — it gates epic #1092’s acceptance.
  13. P9 lab-integration design is unratified (#8873) — its phased landing plan (Atlas serve, queue workers, PM surfaces, build overflow on the cluster) must not be cited as decided. This book cites it only as a draft.
  14. Switches research is dated 2026-04-02/03 — the newest fact in it is seven months older than the rest of the programme; firmware versions, device survival, and the DX010’s missing fans/PSU may have changed. A physical check list is #13920’s stated output.
  15. Mini PCs, Dell machines, spare PCs: counts without specs. “2–3 mini PCs”, “some Dell machines”, “several spare PCs” — no models or specifications in any source read.
  16. No timing exists for any lab item. No record read in the census carries a projected or planned date for any physical or cluster milestone; the roadmap’s Now/Next/Later/Ideas horizons are the only sequencing of record. The High-level roadmap keeps every lab timing entry as “no timing in record” for exactly this reason.

Closing this list

Each gap names its owning issue. A gap closes when the record changes — an inventory lands, a physical check is recorded, an issue is reconciled — and the chapter that carried the gap is updated in the same pass, per Keeping this book current. Gaps do not close by being reworded.